Okonkwo Henry Nnaemeka

Posted on

Full Name: Okonkwo Henry Nnaemeka
Country: Nigeria

Date of Birth. 21st June 2000
Place of Birth: imo State
Weight: 69
Height: 1.82

Position:. Winger, second striker,
Preferred foot: right
Squad number:. 8
Youth club: river lane FC
Current club: proda FC

PLAYER STRENGTH
Marking:. Very good
Nodding. Good
Finishing:. Very good
Pace very good
Long shot good
Creativity very good
Versatility:. Very good
Of the ball movement: very good
Dribbling:. Very Good
Ambidexterity: good
Instinct:. Very good

PLAYER WEAKNESSES

Should improve on nodding, long shot,and ambidexterity

STYLE OF PLAY

Advance striker
Dynamic versatile and mobile attacking player capable of playing anywhere along the front line as a striker,in supporting role and on the wing.
-Creative mobile and unselfish
_very good balance coordination and changes of pace
_like to attack from the wing and cut inside to either shoot or pass
-killer instinct in front of goal
– great sense of positioning while receiving through balls
– extremely dangerous on the counter attacks thanks to his pace and acceleration
– he is best suited at playing as:
Winger 4-3-3
:

ACHIEVEMENT:
2015 championship and mvp
Most valuable player 2016
Highest goals score imo State speaker cup 2017
Most valuable player enugu state under 16 cup 2017
National under 17 invitee 2018

DESCRIPTION:
Okonkwo Henry Nnaemeka made his first debut for river lane in the year 2015 his performance have caught the eyes of much stronger team.two years later he move to proda FC in the year 2017 his performance in proda FC get him the attention of national under 17 coach golden eagles and he was invited but do to m r s scan he was drop

Leave a Reply

Your email address will not be published. Required fields are marked *