Sodiq Odubela

Posted on

Full name. Sodiq Odubela
Country: Nigeria

Date of birth: 25/09/1999 (21 years old)
Place of birth: Ogun (Nigeria)
Height: 177cm

Youth career: Injunior Club (since 2006)
Current club: Phonix FC (Abuja)
Squad number: 02
Current national team: Nigeria U-20
Position: Defender, Full back
Preferred foot: right

Market value (by transfermarkt.de): 50.000 €
Tournaments participated in: —
National wide league
Contract until: 31.12.2022
Player’s agent: unknown
Transfer rumours: —

Similar type of player: Sergio Ramos

Strengths:
– Pace Untitled1
– Finishing Untitled1
– Ambidexterity Untitled1
– Instinct Untitled1
– Dribbling Untitled1
– Ball control Untitled
– Off the ball movement Untitled
– Creativity Untitled
– Versatility Untitled

Weaknesses:

– should improve his play with back to goal Style of play:

– Advanced Offensive defender
– Dynamic, versatile, and mobile defending player capable of playing anywhere along the back-line, as a defender.
– Creative, mobile and unselfish – Very good balance, coordination, and changes of pace
– Likes to defend from the wing and cut inside to either shoot or pass
– Possesses very impressive mid-range and long-range passing skills with his right feet
– Great sense of positioning while defending
– known for his
―quick feet‖, speed of movement and close control
– Extremely dangerous on the counter thanks to his pace and acceleration
– Very direct with his running/tries to get into the final third as soon as possible
– Very good ambidexterity using his left weaker foot
– All-action and energetic

Sodiq controls the ball in the defending and tackling. He is best suited to playing as: Defense in 4-4-2. Video: Achievements: League summary (as for 24 May 2018): Description: Sodiq Odubela made his first-team debut for KK united in 2016 aged only 17. His performances have caught the eye of much stronger clubs and 2 years later he moved to Phonix FC – one of the most successful clubs in Nigeria.

Leave a Reply

Your email address will not be published. Required fields are marked *