Blessing Rioka Ebruvwiyor

Posted on

Full Name: Blessing Rioka Ebruvwiyor
Country: Nigeria

Date of birth: 8/04/1997
Place of birth: Delta (Nigeria)
Height: 176cm
Weight: 65kg
Youth career: – unattached
Senior Career: unattached
Squad Number: 10

Current Club – Supremacy Football Club, Lokoja
Position: left/Right winger
Preferred foot: Right
Market value (transfer market):
Tournaments participated in:- unattached
Contract until: – 2021
Player’s agent:
Transfer rumours:

Similar type of player: Eden hazard

Strength: creativity
finishing
Versatility
Instinct
Flair
Stamina
Dribbling
Positioning
Marking
Off the movement
Pace and acceleration
Link up play
Athleticism
Body balance
Weakness: should improve on the air (heading)

Style of play:
Advance striker
Dynamic, versatile and mobile player cable of playing anywhere along the attacking line.
Creative, mobile and unselfish.
Killer instinct in front of goal.
Likes to capitalize on defensive mistakes.
Great sense of positioning while receiving through balls.
Possess impressive powerful and accurate shooting skills.
Extremely dangerous on the counter, thanks to his pace and acceleration.
Generates many flick ons and passes into the channel for his teammates to utilize.

Achievement:
*Most valuable player of Delta State league under 16 (2013)
*……cup winner (2016)
*……. League winner (2018)
*Silver ball winner (2018)
*……..best player (2019)

Description:
Blessing Rioka Ebruvwiyor (born 8 April 1997). Commonly called BR9 by his fans. Play for.Supermacy FC who play as a winger or attacking mildfielder, often considered to be one of the best player in the world. Blessing is known for his creativity, speed, Acceleration, dribbling, goal scoring and passing. He has been compared to Hazard, Neymar and Messi.

Leave a Reply

Your email address will not be published. Required fields are marked *