Emmanuel Chukwuebuka

Posted on

Full Name: Emmanuel Chukwuebuka
Country – Nigeria

Date of Birth 23/3/ 2004
Height: 180cm
Youth Career: Ceyorts Sport Academic
Senior Career: Future Star F.C, T.S.M F.C
Squad No.: 19
Current National Team: Nigeria U-17
Position: Central Forward
Alternative Position: Left or Right Winger Forward

Preferred Foot: Right Foot
Market Value: (by Transfer Market. unattached
TOURNAMENT PARTICIPATED IN:
2017 UEFA Under 15 Championship Qualification (6/2)
Contract Until: Unknown
Player Agent: i Football
Transfer Rumor: Unknown

SIMILAR TYPE OF PLAYER:
Diago Costa

Strength
 Finishing
Untitled 1
 Pace and Acceleration
Untitled 1
 Instinct
Untitled 1
 Off the ball movement
Untitled 1
 Athleticism
Untitled 1
 First Touch
Untitled
 Link up Play
Untitled
 Fair
Untitled
 Heading
Untitled
 Dribbling

STYLE OF PLAY
 Goal Poacher
 Like to play off the shoulder of the opposition defenders
 Trying to beat offside trap
 Great sense of positioning while receiving through ball
 Very compost finisher capable of both feet.
 Generate many flick on and passes into the channel for his team mate to utilize
 Like to capitalize on defensive mistake
 Extremely dangerous on the counter thanks to his pace and acceleration:
 Aerial threat in the opposition box and good jumping technique.
 Able to sniff out a goal in any situation.
 Possesses, impressive, powerful and accurate shooting skills.
 Often move deep into the midfield and drawing defends with him, in order to create and exploit space for his team mate.
 Decent ambidexterity using his left weaker foot.
 Accurate penalty taker.
He is best suited of laying as centre forward in 4-3-3

ACHIEVEMENT
2017/2018 Local League Winner
2019 Edo State U-17 Winner
2019 Local League U-17 Highest Goal Scorer

LEAGUE SUMMARY
2017/2018 Local League
3 games / 0 goals
2019 Edo State U-17
13 games/ 6 goals

DESCRIPTION
Emmanuel Chukwuebuka is considered to be the most talented young player in Edo State. He made his professional debut for Future Star F.C at the age of 16 on 15 March 2018 in Edo State Division Match against United Star F.C. in 2019, he moved to T.S.M F.C Kaduna the best and in the country and one of the most progressions Club in Kaduna. He scored his first goal for T.S.M against Branco on 7 April 2019.

Leave a Reply

Your email address will not be published. Required fields are marked *