Rayyanu Garba Hammani

Posted on

Full NAME: Rayyanu Garba Hammani
COUNTRY: Nigeria

Date of birth: 10-07-2003
Place of birth: Kebbi state (Nigeria)
Height: 1.76m
Youth career: Magayaki FC (since 2013)
Current club: Magayaki FC
Squad Number : 8

Position: Attacking midfield
Preferred foot: Right
Market value:
Tournament participated: Kebbi state Pro ii league, Pro ii community tournament.
Conract until: August 2020
Player’s agent: 
Transfer rumors:

Similar type of player: Kevin De Bruyne

Strenghts:
-creativity
-incisive passing(long/short)
-dribbling
-positioning
-long range shots
-one -two pass
-set piece
-visionary through balls
-pinpoint passing
-good first touch
-finishing
-control(body and ball)
-stamina
-body balance and strength
-off the ball movements
-calm composure

Weaknesses:
-aerial duels
-speed

Style of play:
Advanced playmaker

-creative, versatile on the attack. Player capable of playing in the central midfield position and attacking midfield position
-creative and unselfish
-likes to pass the ball forward
-likes to play one-two passes
-likes to stay on the edge of the box for rebounds
-killer instincts in front of goal
-possesses highly impressive long range and mid range shooting skills with his right foot
-can run with the ball from box-to-box to enhance attacking play
-possesses the ability to fall back to defend
-great sense of positioning while off the ball
-all-action and energetic
-extremely dangerous while on attack with the ball in his feet
-very good and accurate passes using his weaker foot

Rayyan scores from long range, mid range and also set pieces from close range.
He is best suited to playing as:
Attacking midfielder in 4-3-3

Video
:
Achievements: Won the Pro ii league with Magayaki FC.
League summary (as for May 2020)
Pro ii 2019/2020: 15 games, 6 goals , 3 assists
Pro ii community tournament 2019/2020: 4 games, 1 goal, 2 assists (MAGAYAKI FC)

Description: Rayyanu Garba Hammani made his first team debut for Magayaki FC in 2018 at the age of 15. He had a great debut following an assist to his name in his first game for the club. He continued showing great promise as he played five more games consecutively coming off the bench to pull of a remarkable performance. The next season, (2019/2020) he became indispensable for his team and became a crucial first team player because of his visionary passes, creativity, and also scoring ability. In the 2019/2020 season, he has managed 19 appearances in all competitions and scoring 7 goals and 5 assists. He is a player full of potentials and has the dream and mindset to make it to the top of the game.

Leave a Reply

Your email address will not be published. Required fields are marked *