Abang Peter Ade

Posted on

Abang Peter ade
Country: Nigeria

Place of birth: Lagos (Nigeria)

Height: 195cm

Position: centre forward

Preferred foot: right

Tournaments participated in 2019
Country: Nigeria

Date of birth: 30.08 2002 (17 years old)

Place of birth: Lagos (Nigeria)

Youth career: Christa Villa

Senior career: Christa Villa fc black heart fc.

Squad number: 19

Current national team:

Position: centre forward

Preferred foot: right

Market value (by transfermarkt.de):

Tournament participated in
The Total Africa U-17 Cup of Nations.

Contract until: unknown

Player’s agent: iFootball

Transfer rumours: —penafil fc

Similar type of player: Robert lewandowski

Strengths:

Weaknesses:

No significant weaknesses.

Style of play:

– goal poacher

– likes to play off the shoulder of the opposition defenders

– likes to try to beat offside trap

– great sense of positioning while receiving through balls

– very composed finisher capable on both feet

– generates many flick-ons and passes into the channels for his teammates to utilize

– likes to capitalize on defensive mistakes

– extremely dangerous on the counter thanks to his pace and acceleration

– aerial threat in the opposition box/good jumping technique

– able to sniff out a goal in any situation

– possesses impressive powerful and accurate shooting skills

– often moves deep into midfield and drawing defenders with him, in order to create and exploit spaces for his teammates

– extremely difficult to knock off the ball thanks to his low centre of gravity and good close control

– decent ambidexterity using his left weaker foot

– accurate penalty taker

He is best suited to playing as:
Centre forward in 4-4-2

Achievements:

Nigeria National Division 2014/2015 winner with black heart fc.

Description:

Peter abang Ade. is a Nigeria professional footballer who plays as a striker for black heart fc and later move to christa Villa fc. He is renowned for his positioning, technique and finishing, and is widely regarded as one of the best strikers of his generation.
Currently he is a member of Nigeria U-17 national team.

Leave a Reply

Your email address will not be published. Required fields are marked *