Abang Peter Ade

Abang Peter ade
Country: Nigeria

Place of birth: Lagos (Nigeria)

Height: 195cm

Position: centre forward

Preferred foot: right

Tournaments participated in 2019
Country: Nigeria

Date of birth: 30.08 2002 (17 years old)

Place of birth: Lagos (Nigeria)

Youth career: Christa Villa

Senior career: Christa Villa fc black heart fc.

Squad number: 19

Current national team:

Position: centre forward

Preferred foot: right

Market value (by transfermarkt.de):

Tournament participated in
The Total Africa U-17 Cup of Nations.

Contract until: unknown

Player’s agent: iFootball

Transfer rumours: —penafil fc

Similar type of player: Robert lewandowski

Strengths:

Weaknesses:

No significant weaknesses.

Style of play:

– goal poacher

– likes to play off the shoulder of the opposition defenders

– likes to try to beat offside trap

– great sense of positioning while receiving through balls

– very composed finisher capable on both feet

– generates many flick-ons and passes into the channels for his teammates to utilize

– likes to capitalize on defensive mistakes

– extremely dangerous on the counter thanks to his pace and acceleration

– aerial threat in the opposition box/good jumping technique

– able to sniff out a goal in any situation

– possesses impressive powerful and accurate shooting skills

– often moves deep into midfield and drawing defenders with him, in order to create and exploit spaces for his teammates

– extremely difficult to knock off the ball thanks to his low centre of gravity and good close control

– decent ambidexterity using his left weaker foot

– accurate penalty taker

He is best suited to playing as:
Centre forward in 4-4-2

Achievements:

Nigeria National Division 2014/2015 winner with black heart fc.

Description:

Peter abang Ade. is a Nigeria professional footballer who plays as a striker for black heart fc and later move to christa Villa fc. He is renowned for his positioning, technique and finishing, and is widely regarded as one of the best strikers of his generation.
Currently he is a member of Nigeria U-17 national team.

Nwachukwu Ukochukwu Peter

Nwachukwu Ukochukwu Peter

Country: nigeria

Date of birth: 21/05/1999 (21 years)

Place of birth: Aba

Height: 1.88m

Youth career: Chidex fc/unic standard fc

Senior career: Jblaze FC Owerri

Tournament participated in : 2012 Abia Major League, 2014/ 2016 Mtn league soccer tournament, 2016 grassroot football
Championship qualification 4/4
Contract until unknown

Player’s agent: Mr Kris Essence Elisha
Transfer rumors:……

Similar type of player: Robert Lewandoski

Strengths: finishing

weakness: no significant weakness,

style of play: fast and athleticism in striking, free kick specialist, both left and right footed, quality delivery and pass range, strong in marking, excellent in striking ability, good stamina, perfect ball control, talented in one two touches, good in team work, accuracy in shot target, exceptional in passes, excellent in winning balls, strong in area ball, peace and athleticism, exceptional in short distance pass, skillful and technical, focused in winning matches

He is best suited to play as:
Centre forward in any formation,

Video: https://youtu.be/UZf5iIMBVbg

Achievement: 2012 state champion in Abia major league with 15 goals
2014-2015 MVP helping USFC to win trophies with 13goals and 6 assists 1st season, and 15 goals and 3 assists 2nd season
2016 finalist a sensational player contributing to Chidex FC reaching the final in state grassroot football competition
2016 winner in mtn league soccer tournament
Description : Nwachukwu Peter started his football career as captain in Pepsi football academy under 13 team age 11-13
Captained Aba Sports Club under 13,
Player in Enyimba feeders youth team age 14-15
Played in USFC and Chidex FC in the under 15 teams respecticdly

And is currently holding his contract with Jblaze FC where he plays as a regular striker in the senior team

He is a killer in front of goal with power left/right foot, he is skillful and technical and can turn a match around to his advantage BBS antage. Generally he will give his blood to win every match as it comes.

He had scored 15 goals with 6 assists and 13 goals with 3 assists in previous seasons.
He had not made his professional debut
He is set to shock the world if he makes his professional debut.

Adeniyi Alaba Julius

Full Name: Adeniyi Alaba Julius
Country – Nigeria

Date of Birth: 5th December 1993

City of Birth : Akure

Nationalty: Nigerian

Height :

Weight :65kg

Position:Left wing and left Back

Previous club :Shooting Stars of Ibadan

Present Club:sunshine stars of Akure

Click Video highlight :

Career Experience

2017:Presently player for sunshine stars of Akure in the Nigeria Premier league as a defender

2015/2016: played 36 games for sunshine stars of Akure in the 2015/2016 Nigeria professional league as a left winger

2014/2015: played for Shooting stars Sport Club(3SC) and was an invitee to the Nigeria Under 23 National Team

2013/2014: Semi Finalist in the African Champion league Losing to Al-Ahlay of Egypt in which 52 club from 44 associations participated

2012/13:Semi Finalist in the African Confederation Cup, losing to African Club Of Tunisia, 60 African teams featured

Emmanuel Chukwuebuka

Full Name: Emmanuel Chukwuebuka
Country – Nigeria

Date of Birth 23/3/ 2004
Height: 180cm
Youth Career: Ceyorts Sport Academic
Senior Career: Future Star F.C, T.S.M F.C
Squad No.: 19
Current National Team: Nigeria U-17
Position: Central Forward
Alternative Position: Left or Right Winger Forward

Preferred Foot: Right Foot
Market Value: (by Transfer Market. unattached
TOURNAMENT PARTICIPATED IN:
2017 UEFA Under 15 Championship Qualification (6/2)
Contract Until: Unknown
Player Agent: i Football
Transfer Rumor: Unknown

SIMILAR TYPE OF PLAYER:
Diago Costa

Strength
 Finishing
Untitled 1
 Pace and Acceleration
Untitled 1
 Instinct
Untitled 1
 Off the ball movement
Untitled 1
 Athleticism
Untitled 1
 First Touch
Untitled
 Link up Play
Untitled
 Fair
Untitled
 Heading
Untitled
 Dribbling

STYLE OF PLAY
 Goal Poacher
 Like to play off the shoulder of the opposition defenders
 Trying to beat offside trap
 Great sense of positioning while receiving through ball
 Very compost finisher capable of both feet.
 Generate many flick on and passes into the channel for his team mate to utilize
 Like to capitalize on defensive mistake
 Extremely dangerous on the counter thanks to his pace and acceleration:
 Aerial threat in the opposition box and good jumping technique.
 Able to sniff out a goal in any situation.
 Possesses, impressive, powerful and accurate shooting skills.
 Often move deep into the midfield and drawing defends with him, in order to create and exploit space for his team mate.
 Decent ambidexterity using his left weaker foot.
 Accurate penalty taker.
He is best suited of laying as centre forward in 4-3-3

ACHIEVEMENT
2017/2018 Local League Winner
2019 Edo State U-17 Winner
2019 Local League U-17 Highest Goal Scorer

LEAGUE SUMMARY
2017/2018 Local League
3 games / 0 goals
2019 Edo State U-17
13 games/ 6 goals

DESCRIPTION
Emmanuel Chukwuebuka is considered to be the most talented young player in Edo State. He made his professional debut for Future Star F.C at the age of 16 on 15 March 2018 in Edo State Division Match against United Star F.C. in 2019, he moved to T.S.M F.C Kaduna the best and in the country and one of the most progressions Club in Kaduna. He scored his first goal for T.S.M against Branco on 7 April 2019.

Rayyanu Garba Hammani

Full NAME: Rayyanu Garba Hammani
COUNTRY: Nigeria

Date of birth: 10-07-2003
Place of birth: Kebbi state (Nigeria)
Height: 1.76m
Youth career: Magayaki FC (since 2013)
Current club: Magayaki FC
Squad Number : 8

Position: Attacking midfield
Preferred foot: Right
Market value:
Tournament participated: Kebbi state Pro ii league, Pro ii community tournament.
Conract until: August 2020
Player’s agent: 
Transfer rumors:

Similar type of player: Kevin De Bruyne

Strenghts:
-creativity
-incisive passing(long/short)
-dribbling
-positioning
-long range shots
-one -two pass
-set piece
-visionary through balls
-pinpoint passing
-good first touch
-finishing
-control(body and ball)
-stamina
-body balance and strength
-off the ball movements
-calm composure

Weaknesses:
-aerial duels
-speed

Style of play:
Advanced playmaker

-creative, versatile on the attack. Player capable of playing in the central midfield position and attacking midfield position
-creative and unselfish
-likes to pass the ball forward
-likes to play one-two passes
-likes to stay on the edge of the box for rebounds
-killer instincts in front of goal
-possesses highly impressive long range and mid range shooting skills with his right foot
-can run with the ball from box-to-box to enhance attacking play
-possesses the ability to fall back to defend
-great sense of positioning while off the ball
-all-action and energetic
-extremely dangerous while on attack with the ball in his feet
-very good and accurate passes using his weaker foot

Rayyan scores from long range, mid range and also set pieces from close range.
He is best suited to playing as:
Attacking midfielder in 4-3-3

Video
:
Achievements: Won the Pro ii league with Magayaki FC.
League summary (as for May 2020)
Pro ii 2019/2020: 15 games, 6 goals , 3 assists
Pro ii community tournament 2019/2020: 4 games, 1 goal, 2 assists (MAGAYAKI FC)

Description: Rayyanu Garba Hammani made his first team debut for Magayaki FC in 2018 at the age of 15. He had a great debut following an assist to his name in his first game for the club. He continued showing great promise as he played five more games consecutively coming off the bench to pull of a remarkable performance. The next season, (2019/2020) he became indispensable for his team and became a crucial first team player because of his visionary passes, creativity, and also scoring ability. In the 2019/2020 season, he has managed 19 appearances in all competitions and scoring 7 goals and 5 assists. He is a player full of potentials and has the dream and mindset to make it to the top of the game.

Blessing Rioka Ebruvwiyor

Full Name: Blessing Rioka Ebruvwiyor
Country: Nigeria

Date of birth: 8/04/1997
Place of birth: Delta (Nigeria)
Height: 176cm
Weight: 65kg
Youth career: – unattached
Senior Career: unattached
Squad Number: 10

Current Club – Supremacy Football Club, Lokoja
Position: left/Right winger
Preferred foot: Right
Market value (transfer market):
Tournaments participated in:- unattached
Contract until: – 2021
Player’s agent:
Transfer rumours:

Similar type of player: Eden hazard

Strength: creativity
finishing
Versatility
Instinct
Flair
Stamina
Dribbling
Positioning
Marking
Off the movement
Pace and acceleration
Link up play
Athleticism
Body balance
Weakness: should improve on the air (heading)

Style of play:
Advance striker
Dynamic, versatile and mobile player cable of playing anywhere along the attacking line.
Creative, mobile and unselfish.
Killer instinct in front of goal.
Likes to capitalize on defensive mistakes.
Great sense of positioning while receiving through balls.
Possess impressive powerful and accurate shooting skills.
Extremely dangerous on the counter, thanks to his pace and acceleration.
Generates many flick ons and passes into the channel for his teammates to utilize.

Achievement:
*Most valuable player of Delta State league under 16 (2013)
*……cup winner (2016)
*……. League winner (2018)
*Silver ball winner (2018)
*……..best player (2019)

Description:
Blessing Rioka Ebruvwiyor (born 8 April 1997). Commonly called BR9 by his fans. Play for.Supermacy FC who play as a winger or attacking mildfielder, often considered to be one of the best player in the world. Blessing is known for his creativity, speed, Acceleration, dribbling, goal scoring and passing. He has been compared to Hazard, Neymar and Messi.

Abdurrahman Sabo

Full Names: Abdurrahman Sabo
Country: Nigeria

Date of birth: 10-10-2001
Place of birth: Nasarawa (Nigeria)
Height: 1.66m

Youth career: Golden Stars FC. (Since 2015)
Current club: The challengers FC
Squad number: 8
Position: Central and Attacking Midfielder
Preferred foot: Right.

Market Value:
Tournament Participated: Nasarawa state Premier league
Contract Until: September 27th 2020.
Players Agent:
Transfer Rumors:

Similar type of player: Andres Iniesta.

Strengths:
– vision
– passing
– dribbling
– Flair
– shooting
– Through ball
– set piece
– creativity
– first touch
– reading of the game.
– body balance

Weakness:

– aerial duels
– speed.

Style of play:
– likes to drop back to receive the ball in order to create a chance out of nothing
– a very good through passer
– bosses the midfield with a master press control with his first touch and technical awareness.
– likes to dribble
– an unpredictable player thanks to his fast decision making.
– competent set piece taker.
– good at pin point passes.
– has a great leadership spirit.
– gets fouled often.
– very good at spotting space and his teammates’ runs thanks to his excellent vision and awareness.
– off the ball creative movement in order to create more space to receive a pass.
– very strong in 1v1 situation, unpredictable and very confident of his skills.
– takes long range shot and possess impressive powerful and accurate shooting skills.
– possess significant lower body strength.
– able to sniff out a goal in any situation.
– very good at making feints and dummies to beat opponent.
– five star weak foot.
– likes to play as a free roam midfielder, helping the team in creating chances.

Description:
Sabo’s brilliant performance at the age of 12 (2013) against Samba FC in the U-15 league cup caught the eyes of so many coaches in the state and country at large. He made his first team debut at Golden Stars FC two years later (age 14) making him the youngest debutant at the league’s top level. He then secured a move to his present team ( The challengers FC) and since after then has played a vital role in the team helping them to win the league tittle twice in consecutive occasions. Sabo also holds the record for the most assist in the league during the 2017/2018 season with the record 21 assist in 38 appearance. Though he’s small in size, he is well known for his high level of technical skills and awareness, he also possess an impressive and unbelievable passing abilities and a very good set piece taker. He was invited for the 2019 U-17 world cup trial in Abuja, Nigeria. But unfortunately got injured during the course of the trials. He has also won the Nasarawa state league Youngest Footballer of the year record Twice in succession. Sabo is currently playing for his hometown team The challengers FC. He’s truly a sensational talent.

ODAMA JEREMIAH JAMES

Full Names ODAMA JEREMIAH JAMES
Country: Nigeria

Date of birth: 18/07/1996

Place of birth: Lagos (Nigeria)

Height: 180m

Youth career: Christa Villa fc

Senior career: MfM fc Christa Villa fc, Torino (future transfer 30 June, 2018)

Squad number: 9

Current national team: Nigeria U-23 dream team invitee

Position: centre forward

Preferred foot: right

Market value (by transfermarkt.de): 50.000 €

Tournaments participated in 2019
Lagos under 23 Youth Football Tournament, Country: Nigeria

Contract until: unknown

Player’s agent: iFootball

Transfer rumours: —

Similar type of player: sadio mane

Strengths:

– finishing Untitled1

– pace & acceleration Untitled1

– instinct Untitled1

– off the ball movement Untitled1

– athleticism Untitled

– first touch Untitled

– link-up play Untitled

– flair Untitled

– heading Untitled

Weaknesses:

No significant weaknesses.

Style of play:

– goal poacher

– likes to play off the shoulder of the opposition defenders

– likes to try to beat offside trap

– great sense of positioning while receiving through balls

– very composed finisher capable on both feet

– generates many flick-ons and passes into the channels for his teammates to utilize

– likes to capitalize on defensive mistakes

– extremely dangerous on the counter thanks to his pace and acceleration

– aerial threat in the opposition box/good jumping technique

– able to sniff out a goal in any situation

– possesses impressive powerful and accurate shooting skills

– often moves deep into midfield and drawing defenders with him, in order to create and exploit spaces for his teammates

– extremely difficult to knock off the ball thanks to his low centre of gravity and good close control

– decent ambidexterity using his left weaker foot

– accurate penalty taker

He is best suited to playing as:
Centre forward in 4-3-3.

Video:

Achievements:

Nigeria National Division 2014/2015 winner with glorious day fc

League summary (as for 28 January 2018):

Nigeria National Division 2016/2017: 13 games/9 goals (Christa Villa fc)

Nigeria National Division 2018/2019 winner with akwa stallet

Description:

Odama Jeremiah james is considered to be the most talented young player in Nigeria. He made his professional debut for Christa Villa fc at the age of 17 on 29 November 2015 in a Nigeria National Division match against Calabar rovas fc. In 2017, he moved to MFM fc. the best club in the country and one of the most progressive clubs in the post-Soviet space. He scored his first goal for mfm fc against his old club Christa Villa fc. on 7 April 2013. He is also a regular youth international for Nigeria and currently he is a member of Nigeria U-23 national team.

Sodiq Odubela

Full name. Sodiq Odubela
Country: Nigeria

Date of birth: 25/09/1999 (21 years old)
Place of birth: Ogun (Nigeria)
Height: 177cm

Youth career: Injunior Club (since 2006)
Current club: Phonix FC (Abuja)
Squad number: 02
Current national team: Nigeria U-20
Position: Defender, Full back
Preferred foot: right

Market value (by transfermarkt.de): 50.000 €
Tournaments participated in: —
National wide league
Contract until: 31.12.2022
Player’s agent: unknown
Transfer rumours: —

Similar type of player: Sergio Ramos

Strengths:
– Pace Untitled1
– Finishing Untitled1
– Ambidexterity Untitled1
– Instinct Untitled1
– Dribbling Untitled1
– Ball control Untitled
– Off the ball movement Untitled
– Creativity Untitled
– Versatility Untitled

Weaknesses:

– should improve his play with back to goal Style of play:

– Advanced Offensive defender
– Dynamic, versatile, and mobile defending player capable of playing anywhere along the back-line, as a defender.
– Creative, mobile and unselfish – Very good balance, coordination, and changes of pace
– Likes to defend from the wing and cut inside to either shoot or pass
– Possesses very impressive mid-range and long-range passing skills with his right feet
– Great sense of positioning while defending
– known for his
―quick feet‖, speed of movement and close control
– Extremely dangerous on the counter thanks to his pace and acceleration
– Very direct with his running/tries to get into the final third as soon as possible
– Very good ambidexterity using his left weaker foot
– All-action and energetic

Sodiq controls the ball in the defending and tackling. He is best suited to playing as: Defense in 4-4-2. Video: Achievements: League summary (as for 24 May 2018): Description: Sodiq Odubela made his first-team debut for KK united in 2016 aged only 17. His performances have caught the eye of much stronger clubs and 2 years later he moved to Phonix FC – one of the most successful clubs in Nigeria.

Okonkwo Henry Nnaemeka

Full Name: Okonkwo Henry Nnaemeka
Country: Nigeria

Date of Birth. 21st June 2000
Place of Birth: imo State
Weight: 69
Height: 1.82

Position:. Winger, second striker,
Preferred foot: right
Squad number:. 8
Youth club: river lane FC
Current club: proda FC

PLAYER STRENGTH
Marking:. Very good
Nodding. Good
Finishing:. Very good
Pace very good
Long shot good
Creativity very good
Versatility:. Very good
Of the ball movement: very good
Dribbling:. Very Good
Ambidexterity: good
Instinct:. Very good

PLAYER WEAKNESSES

Should improve on nodding, long shot,and ambidexterity

STYLE OF PLAY

Advance striker
Dynamic versatile and mobile attacking player capable of playing anywhere along the front line as a striker,in supporting role and on the wing.
-Creative mobile and unselfish
_very good balance coordination and changes of pace
_like to attack from the wing and cut inside to either shoot or pass
-killer instinct in front of goal
– great sense of positioning while receiving through balls
– extremely dangerous on the counter attacks thanks to his pace and acceleration
– he is best suited at playing as:
Winger 4-3-3
:

ACHIEVEMENT:
2015 championship and mvp
Most valuable player 2016
Highest goals score imo State speaker cup 2017
Most valuable player enugu state under 16 cup 2017
National under 17 invitee 2018

DESCRIPTION:
Okonkwo Henry Nnaemeka made his first debut for river lane in the year 2015 his performance have caught the eyes of much stronger team.two years later he move to proda FC in the year 2017 his performance in proda FC get him the attention of national under 17 coach golden eagles and he was invited but do to m r s scan he was drop